Sign In | Join Free | My xxjcy.com
China WUHAN RADARKING ELECTRONICS CORP. logo
WUHAN RADARKING ELECTRONICS CORP.
WUHAN RADARKING ELECTRONICS CORP. Electric Meter, Smart Water Meter, Smart Gas Meter & AMI solution
Active Member

9 Years

Home > Smart Electric Meter >

Three Phase Four Wire Smart Electric Meter Remote Control With LCD Display Function

WUHAN RADARKING ELECTRONICS CORP.
Contact Now

Three Phase Four Wire Smart Electric Meter Remote Control With LCD Display Function

Brand Name : Radarking

Model Number : DTZY150

Certification : IEC62053-21; IEC62052-11; IEC62056-21

Place of Origin : Made In China

MOQ : 50

Price : Negotiate

Payment Terms : Western Union, T/T, L/C, MoneyGram

Supply Ability : 5000000 pcs per year

Delivery Time : 35days

Packaging Details : Standard Package

Rated Voltage : 3* 220V380V

Rated Current : 3*20(100)A

Display : Backlit LCD

Com Port : Optical RS485

Baud Rate : 2400bps

Weight : 2.5kg

Contact Now

Three Phase Four Wires Smart Electric Meters Active Reactive Measuring DLMS/COSEM  
 

Features:
 
1. Metering
 
2. Remote ON/OFF Control
 
3. Tariff
 

  • It can set solution for 2 time zones, 2 daily periods and switching time (yy/mm/dd/hh/mm) of both two.1st time zone and daily period solution is default selection, when reach switching time of time zone, it changes to 2nd solution of time zone, and when reach switching time of daily period, it changes to 2nd solution of daily period. Then set switching time again for 2 solutions,when reach switching time of time zone, it changes to 1st solution of time zone, and when reach switching time of daily period, it changes to 1st solution of daily period. Switching time would be clear since changes of time zone solution and daily period solution.
  •  
  • Max 4 tariffs. Each time zone solution can set 14 time zones as max, with starting time and meter number of daily period which is used. Each daily period solution can set 8 daily periods as max, 14 periods per day, with starting time and tariff which is used. Minimum interval of periods is 15 mins., and period interval is larger than actual demand cycle valve, can be set over 00:00.

Public holiday can be set, including date and daily period meter number of each public holiday.
 

  • Weekend holiday can be set, which controlled by tagged word, daily period meter number can also be set for each weekend holiday.
  • If the same for public holiday and weekend holiday, daily period meter number of public holiday will be used.
  • Automatic changeover of century calendar, time, leap year.
  • If tariff number in the period of daily period is larger than tariffs, or the tariffs is 0, the power in the period reckon in tariff 1.

 

4. Demand Measurement
 
5. Settlement Function
 
6. Meter Clear
 
7. Demand Clear
 
8. Event Clear
 
9. Power Freezing
 
10. Security Management & User Authorization
 
11. Warning Function
 
12. Power Off Meter Reading Function
 
13. Clock, Time Function
 
14. Signal Output Function
 
15. Basic Communiction Function
 
16. LCD Display Function

 
 
Summary:

DTZY150-Z three phase four wires remote fee control smart electric meter is a intelligent electric metering product which made of large scale integrated circuit, with Digital sampling processing technology and SMT craft.

It is compatible with IEC 62053-21 <Part 21L Static meters for active energy classes 1.0 and reactive energy class 2.0 ,and meet with DL/T645–2007 <Multi function static meter communication protocol> requirements.

 
 

Main Parameter: 
 

Item   Specification
   
Reference Voltage 3×220V/380V
   
Working Voltage Range 0.8Un~1.15Un
   
Maximum Working Voltage 0.7Un~1.2Un
Reference Current 1.5(6)A 5(40)A 5(60)A 15(60)A 20(100)A
     
Accuracy Active CL 1.0 Reactive CL 2.0
   
Working Temperature -25℃~+60℃
   
Maximum Working Temperature -40℃~+70℃
     

 

Notes:
 
No device inside can be adjust by user.
When installing and using, there should be tight enough for each connection line, to avoid from any bad connection which would cause heating to damage the meter. Make sure of the right connection of input and output. Please install the meter on local where is dry and ventilated. Don’t put in the place under direct highlight, especial for infrared window. When using infrared communication, it should take more attention to avoid from any disturb from highlight to infrared interface, and please adjust the distance and angel of infrared, to make sure of reliable communication.
 
 

 
Three Phase Four Wire Smart Electric Meter Remote Control With LCD Display Function
 
 
 
 

 

Why Choose Us

* Professional manufacturer for more than 15 years.

* Highly experienced production team in RADARKING factory work-shop.

* QC Systerm: Quality controlled on all production lines, and QC inspectors work independently from the production line.

* Good quality production with quick delivery.

* Accepted OEM/ODM.

* Accepted small MOQ.

* Factory certification: ISO9001, 14000, STS

 


Product Tags:

domestic electric meter

      

digital smart meter

      
Buy cheap Three Phase Four Wire Smart Electric Meter Remote Control With LCD Display Function product

Three Phase Four Wire Smart Electric Meter Remote Control With LCD Display Function Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: WUHAN RADARKING ELECTRONICS CORP.
*Subject:
*Message:
Characters Remaining: (0/3000)